Reel drum installation at BM-K6

                                                                            The project’s background was the following:

- drum shell worn out

 

The new reel drum shell has been welded and rolled out from the steel sheet. Drive side journal has been modernized to set up the water joint of Kadant Johnson Systems production, in order to have the cooling of the reel drum, and also the water feed and removal sytem has been implemented.

In August 2015 the reel drum has been installed and commissioned at the Customer’s site. By the moment the Customer has specified the quality operation of the reel drum operation which satisfies all the production demands.